-
Energy Management Center Projects
A very good experience in experimental work and test-rig configeration. Otherwise, the ability of the measurement with hot wire anemometer and Phase doppler particle analyzer (PDPA), configure their hardware setup as well. In addition, have a good experience in Fluent. Read more
-
1- project name: welding test, and pilot test for cofferdam lifting tool for handling the isolating gates
Company: ALSTOM (AWS)
Place: El Nour Pumping station.
2- project name: welding test, and pilot test for cofferdam lifting tool for handling the isolating gates
Company: ALSTOM (AWS)
Place: Moheet Zagloul Pumping station..3- project name: Total Station and leveling optical tool, Beano wire with special internal Micrometer for steam turbine and generator.
Place: El-Tebbin Power. Station.
Company: ALSTOM Egypt for Power & transport Projects.4- project name: The civil works to measure the ground loading capacity.
Company: ALSTOM Egypt for Power & transport Projects.
Place: El-Tebbin Power. Station.5- project name: Design work, manufacturing follow-up and inspection of a duel fuel burner
(Gas, Light Oil, & Gas/Light Oil) with the following specs.
1- power: 111.6 kW
2- fuel consumption: 3.5 Gal/min
3- air flow rate: 135 Litre/min
4- temperature control using thermocouple is included.
Company: GEMMA
Place: Industrial zone, Arab Abo-Saaed, Helwan Auto street6- project name: workshop drawings for all the parts of the motorcycle chassis by reverse engineering according to the Specimen.
The work incuded
1- Parts drawings are folded and unfolded.
2- Parts coding.
3- 2D assembly for the whole chassis.
4- 3D assembly for the whole chassis.
5- Bell of quantities per chassis.
6- The drawings will be delivered in both hard and soft copies.
Company: (ECCID) Engineering Company For Commerce and Industrial Development.
Place: Industrial zone, 6th of October7- project name: Design of 25 ton double girder bridge crane of span 7500 mm.
Company: TRUMAN electronics.
Place: Abu-Rawwash Industrial zone8- project name: Design work, manufacturing follow-up and inspection of 500 kg crucible furnece for aluminum smelting.
Company: GEMMA.
Place: Industrial zone, Arab Abo-Saaed, Helwan Auto street9- project name: Faprication follow-up, welding test, and pilot test for weed screen cleaning machine.
Company: ALSTOM
Place: KOM OMBO pumping station – BALLANA
KOM OMBO pumping station – Al TAWISA